This example calculates a two-hour battery schedule for a small feeder with different electricity prices in each hour. It includes the network data, device ratings and checks on the solution. The data are synthetic and the solver is Ipopt. The Julia examples are run when the documentation is built.
Install from a checkout
Use Julia 1.10 or later. Clone the repository, enter it, and install the pinned dependencies:
git clone https://github.com/frederikgeth/PowerOptLab.jl.git
cd PowerOptLab.jl
julia --project=. scripts/instantiate_pinned.jl
julia --project=.If you already have a checkout, run the last two commands from its root. The setup script installs the BMOPFTools revision declared in Project.toml; BMOPFTools is unregistered. It replaces any local development-path override in this project's manifest. The first installation and compilation take longer than subsequent runs.
Paste the following Julia blocks into that REPL in order. You can also save them together in a script and run julia --project=. your_script.jl.
Build two network snapshots
The network is a 230 V single-phase circuit with an explicit phase and neutral line. Only the source neutral is grounded; the load-bus neutral is a network variable. A 2 kW load is present in both one-hour intervals. The only changed input is the source's price, in currency/kWh.
using PowerOptLab
using BMOPFTools: parse_bmopf
function feeder(price)
parse_bmopf("""
{
"bus": {
"grid": {"terminal_names": ["1", "n"],
"perfectly_grounded_terminals": ["n"]},
"house": {"terminal_names": ["1", "n"]}
},
"voltage_source": {
"supply": {"bus": "grid", "terminal_map": ["1"],
"v_magnitude": [230.0], "v_angle": [0.0],
"cost": [$price]}
},
"linecode": {
"cable": {"R_series_1_1": 0.05, "R_series_2_2": 0.05}
},
"line": {
"service": {"bus_from": "grid", "bus_to": "house",
"terminal_map_from": ["1", "n"],
"terminal_map_to": ["1", "n"],
"linecode": "cable", "length": 1.0}
},
"load": {
"demand": {"bus": "house", "terminal_map": ["1", "n"],
"configuration": "SINGLE_PHASE",
"p_nom": [2000.0], "q_nom": [0.0]}
}
}
"""; from_string=true)
end
nets = [feeder(0.30), feeder(0.10)]
grid = TimeGrid([1.0, 1.0])Terminal labels are strings and the terminal-map order matches the linecode matrix order. Network powers are in W, voltages in V and impedances in Ω. This is a single-phase teaching example. Three-phase unbalance and equipment calibration require additional network and device data.
Add storage and solve
The battery can charge or discharge at 1 kW, starts at 2 kWh, and must finish at the same stored energy. Its efficiencies refer to the AC-to-stored-energy boundary. The solve includes line losses and couples the intervals through the energy balance.
battery = StorageDevice(
id="battery", bus="house",
p_charge_max=1000.0, p_discharge_max=1000.0,
energy_max=4000.0, energy_init=2000.0,
eff_charge=0.95, eff_discharge=0.95,
cyclic=true, i_max=10.0, s_max=1000.0,
)
result = solve_multiperiod_opf(
nets, [battery]; time_grid=grid,
solver_options=(tol=1e-8,),
)
status = solve_status(result)
(termination=status.termination_status, publishable=status.publishable)(termination = "LOCALLY_SOLVED", publishable = true)Ipopt solves a nonconvex nonlinear model. A published local solution is useful for this example, but its status does not establish global optimality. The default operation=:relaxed bounds simultaneous charging and discharging by a finite normalized product tolerance; inspect the physical residuals as well as the status.
Check the status before reading dispatch
if !status.publishable
error("No published dispatch: $(status.termination_status)")
end
dispatch = result.dispatch["battery"]
(
net_injection_w=round.(dispatch.p_net; digits=2),
stored_energy_wh=round.(dispatch.energy_wh; digits=2),
horizon_cost=round(result.objective; digits=4),
)(net_injection_w = [902.5, -1000.0], stored_energy_wh = [2000.0, 1050.0, 2000.0], horizon_cost = 0.6317)Positive p_net means injection into the network (discharging); negative means charging. Expect discharge in the expensive interval and recharge in the cheap one. There are two power values and three energy values: the initial state and the end of each interval. energy_wh is stored energy in Wh; the compatible soc field has the same units, rather than being a fraction.
On a failed solve, the wrapper retains status information and masks unpublished numerical results with NaN. Changing the solver settings without checking that status can make a failed candidate look like a schedule.
Check physical residuals and a network voltage
The following checks use illustrative budgets of 0.01 Wh for energy and 0.1 W for power. Choose budgets from the accuracy required by your own study.
diagnostics = dispatch.diagnostics
@assert maximum(abs.(diagnostics.energy_balance_wh)) < 0.01
@assert abs(diagnostics.terminal_energy_error_wh) < 0.01
@assert maximum(abs.(diagnostics.ac_power_balance_w)) < 0.1
@assert maximum(diagnostics.power_limit_violation_w) < 0.1
@assert maximum(abs.(diagnostics.simultaneous_power_w)) < 0.1
@assert dispatch.p_net[1] > 0 && dispatch.p_net[2] < 0
# Each snapshot reports conductor potentials in SI units.
bus = result.snapshots[1]["bus"]["house"]
phase_voltage = complex(bus["1"]["vr"], bus["1"]["vi"])
neutral_voltage = complex(bus["n"]["vr"], bus["n"]["vi"])
load_voltage = abs(phase_voltage - neutral_voltage)
@assert 220.0 < load_voltage < 240.0
(
maximum_energy_residual_wh=maximum(abs.(diagnostics.energy_balance_wh)),
maximum_power_bound_violation_w=maximum(diagnostics.power_limit_violation_w),
maximum_mode_residual_w=maximum(abs.(diagnostics.simultaneous_power_w)),
load_voltage_v=round(load_voltage; digits=3),
)(maximum_energy_residual_wh = 0.0, maximum_power_bound_violation_w = 0.009908431804354328, maximum_mode_residual_w = 0.009908431804354328, load_voltage_v = 229.522)These checks validate this returned schedule under its declared model. The mode residual is the absolute smaller charge/discharge power. Solver tolerances can produce a small negative value for a nominally nonnegative power; the power-bound check measures that violation separately, without clipping dispatch. The voltage check is an observation at the solved point; this example does not impose a voltage operating band or prove feasibility under other loads or prices. See Concepts for units and interpretation of solver status.
Choose your next study
| Your question | Next guide |
|---|---|
| How do storage assumptions affect dispatch? | Battery storage and multi-period OPF |
| Can an EV meet its departure target through a given outlet? | Electric vehicles |
| How do source impedance, grounding and voltage regulation affect the result? | Generators |
| Do converter topology, limits or local controls change the operating point? | Inverter-based resources |
| What states or model parameters are supported by evidence? | State and model inference |
| What can a declared set of operating-envelope checks establish? | DOE in 15 minutes |
For power-flow branches, static checks or neutral reduction, use the power-flow and operability overview. For numerical representations and solver tolerances, use formulation studies. The home page maps all six study topics, and the API index locates their callable interfaces.