EV scope and limitations
Supported models
The current models provide disconnected conductor isolation, current and apparent-power ratings, equal-power or explicit independent phase dispatch, normalized mode relaxation and exact MPCC encoding, fixed AC outlet assignments, vehicle/equipment/session capability intersections, energy diagnostics, and optional monotone acceptance envelopes with exact or conservative smooth bounds.
It retains EVDevice and the PE stored-energy convention while making the numerical relaxation explicit. All multi-phase PE ports now require a conductor rating. These changes should be treated as model changes when reproducing old studies, not as a numerical performance update.
Unsupported studies and required model layers
| Missing model layer | Studies requiring it | Required data and validation |
|---|---|---|
| Persistent vehicle trajectories and trip withdrawals | Home–work–home, fleets and depot returns | Boundary event ordering, measured arrival states, trip-energy accounting; never reset energy at each visit |
| DC EVSE and shared conversion groups | Multiple dispensers on one power cabinet | Stamp AC conversion once; couple per-port DC V/I/P and cabinet limits; distinguish cable and converter ratings |
| Measured loss and pilot-response maps | Low-current efficiency, deliverable control schedules | AC/DC boundaries, standby/on losses, pilot versus accepted current, response and sampling times |
| IVQ/thermal/aging composition | Fast-charge feasibility, temperature and lifetime studies | Shared battery/converter interfaces, calibrated data and independent replay; avoid duplicate losses |
| Scenario/MPC driver | Early departures, outages, forecast errors | State transfer, nonanticipativity, explicit shortfalls, out-of-sample evaluation |
| Aggregate service contracts | DOE/ancillary services | Disaggregation, activation duration, recovery, uncertainty and feeder feasibility |
| Minimum/discrete pilots and assignment MPCCs | Operational scheduling and allocation | Exact discrete semantics, multiple starts, numerical residuals, implementation replay |
These model layers are not implemented. In particular, the current model does not implement trip withdrawals, shared DC cabinets, stochastic control or optimized assignments. A session's occupancy mask is not a mobile battery.
NLP and MPCC design principles
- Keep fixed assignments, equipment schedules and known trips as input data unless their optimization answers the study question.
- Impose multiple capability bounds separately instead of introducing a nonsmooth minimum unnecessarily.
- Reuse exact affine/concave upper-bound formulations before smoothing.
- Normalize complementarity pairs with physical equipment scales and report physical as well as dimensionless residuals.
- Treat a finite product relaxation, fractional assignment or averaged pilot as an approximation with a quantified implementation gap.
- Keep sampling, model fit, smoothing and solver tolerances separate.
- Compare economic cases with matched initial/final inventory and distinguish physical service from a model's controllable feasible set.
Validation requirements for these studies
A study using an additional model layer needs an analytical or independently simulated reference, a calibrated/illustrative data declaration, and a domain where its conclusion is valid. A counterexample can establish why the extra mechanism changes the decision. Examples include trip-energy conservation over repeated visits; shared-cabinet conservation with two outlets; held-out pilot tracking; temperature trajectories against measured charging; and explicit disaggregation of every sampled aggregate offer.
Smooth NLP or MPCC compatibility is a mathematical modeling choice. It does not supply global optimality, field controllability, standards compliance, or a battery safety certificate on its own.